Attention factors and installation process of stabilized soil mixing station

Date: 2019-06-03 04:06 popularity:

In recent years, with the rapid development of the market economy and the growth of all aspects of life, the stabilized soil mixing station has been widely applied in the market. It is mainly a device for mixing all kinds of mixtures. So, do you know which aspects of the stabilized soil mixing station need to be noted? What are the steps of installation? Next, we will have a detailed understanding of the "attention factors and installation process of stabilized soil mixing station".



What matters should be noticed in the construction of the stabilized soil mixing station at the construction site?


Stabilized soil mixing station has been widely applied now. It is a special equipment for mixing various kinds of mixture to make stabilized soil. However, the stabilized soil mixing station should pay attention to certain problems after construction. How much do you know about these problems?


One The construction site of stabilized soil mixing station should have flood control, drainage system and measures, and roads should be kept unimpeded.


2. the foundation ditch and the trough should have a systematic drainage ditch, and the stability of the soil wall of the stabilized soil mixing station should be checked regularly to avoid the collapse of the earth.


3. after the template is brushed with the isolating agent, it should be covered and prevented from being washed by rainwater; if it is found that the concrete mixing station is washed away by rain, it should be re painted and the concrete will be poured.


4. the water content of sand and stone in the stabilized soil mixing station should be measured regularly, and it should be deducted from the amount of water added in the mix proportion.



5. the stable soil mixing station should be covered when transporting raw materials and stabilizing soil on rainy days.


6. before the stabilized soil mixing station is irrigated with stabilized soil, the accumulated water in the mold should be discharged.


7. if the open structure and components of the stabilized soil mixing station are required for continuous construction without leaving construction joints, rain shelter should be installed. Otherwise, adequate rain protection materials (such as tarpaulins, linoleum, etc.) should be prepared to cover them in time and prevent rain erosion. If the surface of the component is washed by rain, it should be re pressed.


8. the electric machinery and electric wire of the stabilized soil mixing station should be checked by electricians regularly whether there is electricity leakage or not.


The main problems we should pay attention to after the construction of the stabilized soil mixing station are these. We must carry out reasonable operation according to the instructions so as to continuously improve our work efficiency. We will also continuously improve the product performance and strive for wider application.


The gathering point for producing stable soil machines is the stabilized soil mixing station.


The stabilized soil mixing station is a gathering point of equipment for producing stable soil machines, including cement tanks, metering and transportation equipment and mixing equipment. In recent years, with the continuous development of key infrastructure projects such as highways, airports and high-speed railways, the stabilized soil mixing station is constantly showing its talents. How to install the stabilized soil mixing station correctly?



First, the finished material conveyor belt should be expanded from the bending point and the front and rear legs should be fixed to connect the frame well. Then the mixing machine and powder mixture and the installation of the system, the installation of the finished storage hopper, the installation of the granular batching system, the installation of the cement bin and the installation of the screw conveyor shall be carried out. After the installation is completed, the air compressor will be placed beside the finished hopper and the air compressor will be installed. The outlet is connected well with the inlet of the gas control box, and the outlet of the gas control box is connected with the trachea where the arch is broken.


For professional installers, The installation of stabilized soil mixing station is not complicated, as long as we follow certain steps and operate carefully. However, we must pay attention to the fact that installation may not be successful once. Various deviations and problems may arise during the installation process, and these deviations may affect the operation after being put into use, or even lead to inability to operate.


Therefore, in order to ensure that the installation is successful and smoothly put into use, after the installation is completed, a comprehensive inspection and debugging should be carried out according to the regulations, and the hidden danger can be eliminated in time.


The above is about "what matters should be noticed in the construction of the stabilized soil mixing station at the construction site" and "Introduction to the stable soil mixing station" for the production of stabilized soil machines, hoping to help you understand the "attention factors and installation process of the stabilized soil mixing station".